Colorado plant, in planning

Defense

Counter-drone integration, ground stations, vehicle communications and print cells, built to your equipment list. Plus the plant lines behind them: integration, fabrication and test for missile defense and space hardware.

See the defense systems
Counter-drone vehicle integration
Letters of intent only
Mobile ground station
Letters of intent only
Vehicle communications fit
Letters of intent only
Portable equipment room
Letters of intent only
Containerized print cell
Letters of intent only

Services by the job

Plant lines

Bring your own hardware and book the line you need. Each line has its own specification and order desk.

Integration

Radios, satellite terminals, power and racks fitted to your vehicle, shelter or container.

Bay by the week

Reservations openReserve a bay week

Test

Thermal, vacuum and vibration testing, from an individual run to a staffed campaign.

Chamber day, vibration hour or campaign

Reservations openReserve test time

High bay

Crane-served assembly space for spacecraft structures and large hardware.

Bay by the month

Reservations openReserve a high bay

One drawing, three lines

A ground terminal can need a rack installation, an inspection record and an environmental test. Scope each job against the same drawing revision.

  1. Rack installation

    Identify the terminal, power equipment and wiring that must fit the approved layout.

  2. Acceptance record

    Specify which part and lot records accompany the rack, including inspection results and any open exceptions.

  3. Environmental test

    Agree on the chamber run or vibration test and the measurements that go into the handover.

Vacuum optical bench Letters of intent onlyHosted antennas Planned