Interceptor and missile components
Structures, cable harnesses and electronics assemblies built to prime contractor drawings for interceptor, missile and missile defense programs. Each lot ships with its inspection record.
Request a letter of intent- Line status
- Letters of intent only
- Request unit
- Part number or lot
- Site
- Colorado plant, in planning
- Payment at reservation
- $0
Line specification
Job specification
Prime contractors and their suppliers on interceptor, missile and missile defense programs. The plant handles no energetics.
- Request unit
- Part number or lot
- Price basis
- Quoted per job
What you send
- The drawing package at its released revision, quantities and the inspection requirements.
- At the next review, materials, finishes and any handling requirements through an agreed channel.
What you get back
- Parts and assemblies identified by part number, lot and drawing revision.
- Lot records, inspection results and any open exceptions.
Drawing package review
A review of the drawing package can be scoped before you request a lot. Ask us to check the revision, materials and inspection requirements for a specific part. Deliverables include a revision list, a requirement-to-record index, an exception list and a review copy. Timing depends on staffing and scope review.
Ask about a package reviewExample job
A harness lot for a test article
A supplier needs a repeatable lot of cable harnesses for an inert test article.
- Work scope
- The drawing fixes the materials and routing. The job covers fabrication, continuity checks and inspection of the called-out features.
- Handover
- The supplier receives the lot with its drawing revision and inspection record.
Line availability
A letter of intent is free and non-binding. It records your interest so the build can be scheduled when the plant opens.
| Plant line | Request unit | Open capacity | Order desk |
|---|---|---|---|
| Interceptor and missile components | Part number or lot | Letters of intent only | Request a letter of intent |