Build to print

Reserve a production slot for a drawing revision and a lot. Define the inspection record before work begins.

Reserve a production slot
Line status
Reservations open
Request unit
Part number or lot
Site
Colorado plant, in planning
Payment at reservation
$0
Build to printReservations open

Line specification

Job specification

Component suppliers and equipment manufacturers with released drawings.

Request unit
Part number or lot
Price basis
Quoted per job

What you send

  • Identify the part and expected quantity. The line covers machined or printed parts, cable harnesses, electronics boxes and battery packs.
  • At the next review, the released drawing, revision, materials and inspection requirements through an agreed channel.

What you get back

  • Parts or assemblies identified by part number, lot and drawing revision.
  • Inspection results and a record of any agreed changes or deviations.

Lot acceptance record review

A drawing and record review can be scoped before you book floor time. Ask us to review the acceptance package for a specific part revision or lot. Deliverables include a revision list, a requirement-to-record index, an exception list and a review copy. Timing depends on staffing and scope review.

Ask about a record review

Example job

An instrument mounting bracket

A scientific equipment maker has a released drawing for a replacement bracket and needs a repeatable lot.

Work scope
The drawing fixes the material and dimensions. The job includes machining and inspection of the features called out by the maker.
Handover
The maker receives the lot with its drawing revision and inspection record.

Line availability

Reservations are free and non-binding. Quotes and scheduling follow the review of your request.

Line availability for the Colorado plant
Plant lineRequest unitOpen capacityOrder desk
Build to printPart number or lotReservations openReserve a production slot