Build to print
Reserve a production slot for a drawing revision and a lot. Define the inspection record before work begins.
Reserve a production slot- Line status
- Reservations open
- Request unit
- Part number or lot
- Site
- Colorado plant, in planning
- Payment at reservation
- $0
Build to printReservations open
Line specification
Job specification
Component suppliers and equipment manufacturers with released drawings.
- Request unit
- Part number or lot
- Price basis
- Quoted per job
What you send
- Identify the part and expected quantity. The line covers machined or printed parts, cable harnesses, electronics boxes and battery packs.
- At the next review, the released drawing, revision, materials and inspection requirements through an agreed channel.
What you get back
- Parts or assemblies identified by part number, lot and drawing revision.
- Inspection results and a record of any agreed changes or deviations.
Lot acceptance record review
A drawing and record review can be scoped before you book floor time. Ask us to review the acceptance package for a specific part revision or lot. Deliverables include a revision list, a requirement-to-record index, an exception list and a review copy. Timing depends on staffing and scope review.
Ask about a record reviewExample job
An instrument mounting bracket
A scientific equipment maker has a released drawing for a replacement bracket and needs a repeatable lot.
- Work scope
- The drawing fixes the material and dimensions. The job includes machining and inspection of the features called out by the maker.
- Handover
- The maker receives the lot with its drawing revision and inspection record.
Line availability
Reservations are free and non-binding. Quotes and scheduling follow the review of your request.
| Plant line | Request unit | Open capacity | Order desk |
|---|---|---|---|
| Build to print | Part number or lot | Reservations open | Reserve a production slot |