Skip to content

Catalog · Reviewed 2026-09-16

Every line we sell, and every line we do not.

Three programs, line by line: what you receive, how it is bought, what has to exist before it can start, and the earliest it can happen. Each line carries the stage it is actually at.

No prices. A unit of sale says how a line is bought; the number is quoted against your requirement. Nothing here is a claim that a facility, an instrument, or a service exists today.

Lines
26
Quoting today
14
Programs
5

14 lines

FORGE

Manufacturing and flight qualification. The lines that carry a requirement in and a measured record out.

LineWhat you receiveUnit of saleStatusPrerequisiteEarliest
F-01Thermal vacuum qualification campaignTest report, raw telemetry, chamber log, thermocouple map and the article returned with its recordPer campaign, priced by chamber hours and cyclesQuoting todayFacility commissionedOn facility
F-02Thermal cycling to a stated specificationCycle count, dwell and ramp record against the specification, with excursions loggedPer campaign, priced by cycles and rangeQuoting todayFacility commissionedOn facility
F-03Vibration, shock and acoustic qualificationSignature before and after, resonance survey, notching recordPer campaign, priced by axis and levelQuoting todayFacility commissionedOn facility
F-04Combined environment test, thermal vacuum with optical measurementOptical performance measured while the article is at temperature and pressure, not before and afterPer campaignQuoting todayVacuum optical cellOn facility
F-05Optical performance characterisation under vacuum at temperatureWavefront, throughput and pointing measured in the environment the optic will work in, with the measurement chain documentedPer article, priced by aperture and temperature rangeQuoting todayVacuum optical cellOn facility
F-06Sensor characterisation under representative illuminationBehaviour of an optical sensor at low sun angle, high contrast and long shadow, which is where the bench and the surface divergePer sensor, per illumination caseQuoting todayVacuum optical cellOn facility
F-07Traceable calibration and measurement system analysisCalibration certificate with an unbroken traceability chain, plus gauge repeatability and reproducibilityPer instrument, annual recallQuoting todayCalibration accreditationFirst 12 months
F-08Contamination control and transit bakeoutOutgassing record, witness plate results, cleanliness level certified at handoverPer article or per shipsetQuoting todayCleanroom bayOn facility
F-09Payload interface verification and post integration optical checkInterface conformance evidence, alignment record and an optical check after integration rather than before itPer integration, priced per interfaceQuoting todayNone beyond staffImmediate
F-10Additive part qualification programmeCoupon results, machine installation qualification, witness articles and the parameter set locked to the resultPer material and machine combinationQuoting todayAdditive capabilityYear 1 to 2
F-11Batch qualification for a material and machine combinationOne qualification that covers a bracketed parameter range instead of requalifying on every small changePer batch definitionIn developmentAdditive capability and method acceptanceYear 2
F-12Precision optical componentsThe component, plus its instrumented recordPer partQuoting todayOptical fabricationYear 1 to 2
F-13Precision machined componentsThe component, plus its instrumented recordPer partQuoting todayMachining capabilityYear 1
F-14Per part instrumented recordMaterial of record, machine of record, operator, measurement chain, raw data and a hash, delivered with the article and retainedIncluded with every article, licensed separately for third party partsQuoting todayNoneImmediate

6 lines

WIRES

Power provision, management and distribution, and the independent measurement that verifies what crossed an interface.

LineWhat you receiveUnit of saleStatusPrerequisiteEarliest
W-01Power management and distribution unitsConversion, regulation, protection and switching hardware qualified to the interface it servesPer unitIn developmentDesign and qualificationYear 2
W-02Surface power distribution harnessCable, connector and protection design for distance runs at voltage, with the loss budget measured rather than calculatedPer run, priced by length and ratingIn developmentDesign and qualificationYear 2
W-03Power interface verification and acceptance measurementIndependent measurement of what actually crossed the interface, against what each side expected to deliver and receivePer interface, per campaignIn developmentInstrumentationYear 1 to 2
W-04Independent measurement referee, power beaming and radio frequencyA measurement by a party with no stake in the result, which is what an acceptance test is forPer test campaignIn architectureInstrumentation and methodYear 2 to 3
W-05Power provision against a delivered energy agreementEnergy delivered and verified, billed on the verified quantityPer kilowatt hour delivered and verifiedIn architectureAn instrument that does not yet exist anywhereGated
W-06Energy storage characterisationCapacity, rate and degradation measured across the temperature range the mission actually seesPer cell, module or stringIn developmentFacilityYear 2

4 lines

NEXUS

Lunar economy intelligence. Analysis of what an architecture assumes, priced per question rather than per seat until the corpus is deep enough for seats.

LineWhat you receiveUnit of saleStatusPrerequisiteEarliest
N-01Interface mismatch analysis for a named architectureEvery interface where the provider and the receiver disagree, quantified, ranked and traced to its sourcePer architecture, per revisionQuoting todayNone, method provenImmediate
N-02Price ladder and input output matrixA maintained, machine readable dataset of what lunar goods and services are said to cost and what each system consumes and producesPer report, then per seatIn developmentCorpus maintenanceYear 1 to 2
N-03Subsidy gap analysisWhat anchor commitment closes a business case that does not close on its own, computed rather than assertedPer caseIn developmentCorpusYear 1 to 2
N-04Measurement corpus accessReference data from qualification campaigns, structured so it can be used to design against rather than readPer seat, per domainIn developmentCorpus volumeYear 2 to 3

1 line

HERMES

In-space mobility. Held at a named trigger, with no spend against it.

LineWhat you receiveUnit of saleStatusPrerequisiteEarliest
H-01Dynamic space operations and orbital carrierNot offeredGated, no spend until a named triggerGatedA named triggerNot offered

1 line

ATLAS

Precision lunar delivery. Phase 2, and not offered today.

LineWhat you receiveUnit of saleStatusPrerequisiteEarliest
A-01Precision lunar logisticsNot offered. Every render is an artist's concept of hardware that is unbuilt, untested and unqualifiedGated, Phase 2GatedA named triggerNot offered

Reading the table

What the four statuses mean.

Quoting today means a requirement can be scoped and priced now. In development and in architecture mean the line is being built and is not sold. Gated means the company has decided not to sell it until a named trigger, and the line stays visible so the decision is visible.

The prerequisite column lists what each line requires. Any facility, instrument, or accreditation named there is not yet in place. The earliest column gives the start timing once those prerequisites are in place.

The other half of a catalog

What we do not sell, and will not quote.

  • Weapon design and weapon carriage. The position in high speed flight is the manufacturing and qualification layer, not the weapon.
  • Anything requiring a facility clearance until a sponsoring contract exists. Clearance is sponsorship dependent and is pursued when it is real.
  • Classified work of any kind.
  • Flight hardware delivery to a lunar surface mission remains gated and is not sold today.
  • Certification against a standard the company does not hold accreditation in. Measurement and evidence are sold. A certificate we are not accredited to issue is not.

Bring the requirement, not the part number.

A line becomes a quote when there is an article, a condition, and a criterion to measure against. Tell us those three and the reply says what we can establish, what we cannot, and what it would take.